One
of the school organizer's first tasks is to arrange for a site survey.
The lead technician conducts a walk-through visit to the school site,
accompanied by the school organizer and the site administrator. You
should also invite the facilities manager or chief engineer for the
school or district. The purpose of the survey is to assess the site
for any obstacles to running cable and to decide where the cable
runs should go.
Here
are the concerns to address in the site survey.
- The NetDay objective
is to wire six classrooms to one central point (as shown in
our sample wiring plan). You may want to concentrate your efforts
on key facilities (the library, administration building, computer
labs) and then consider which classrooms to wire. Assign priorities
in case you run out of cable.
- The
NetDay kit allows for two "drops" (where jacks
are wired to the cable to provide network outlets)
per classroom. Two or more drops per classroom
make it much easier to determine the source of
any problem that may arise.
- Referring
to the floor plans,
find the main telecommunications
service entry point
(usually a phone
closet in the administration
wing). This is the
school's external
connection to the
Internet. Then decide
on the location of
the central point,
where the conduit
topology will allow
the shortest run
to each classroom
to be served. The
central point should
be in a secure utility
space with a separate
electrical circuit
(to help protect
the network from
power surges) and
should be adequately
ventilated. Mark
the locations of
both points on the
floor plan.
- Decide
where
to
put
the
drops
in
each
classroom
-
that
is,
where
to
install
the
jacks.
Remember
that
Category
5
cable
cannot
be
used
for
runs
longer
than
328
feet
(100
meters),
including
service
coils
and
patch
cords.
Mark
the
drops
on
the
floor
plan.
- Inspect
the
possible
wiring
routes
back
to
the
central
point
to
ensure
that
they
are
not
blocked
by
structural
barriers
such
as
concrete
walls
or
asbestos.
Note
on
the
floor
plan
where
plenum-rated
cable
will
be
required.
Don't
plan
runs
on
roofs
or
through
attics
that
can
reach
high
temperatures
(heat
degrades
Category
5's
data
transmission
capabilities).
Refer
to
the
NetDay
Cable
Installation
Guide
for
details
on
surface
mounting
cable
or
stringing
it
through
walls,
floors,
and
ceilings.
After the site survey,
the technician maps out the cable runs in the wiring plan. If
accurate, architectural computer-aided design (CAD) floor plans
exist for the school site, we recommend using them to draw up
the wiring plan, so that you can easily estimate the amount of
cable you will need. Otherwise, you will have to measure each
run. It may speed things up when you're measuring to remember
that ceiling tiles are 2 feet square. Don't forget to allow for
the distance from the ceiling to the drops, and follow the rules
for allowing slack in the NetDay Cable Installation Guide.
See Sample
Wiring Plan
"Our
plan for NetDay was to wire five classrooms and a library.
In fact, we did 10 classrooms and a three-room library in
one afternoon with 80 volunteers, and we installed about
5,500 feet of cable. We've already had NetDay II, wiring
an additional 22 classrooms with another 6,500 feet of cable.
Things went like clockwork. . . . I wouldn't have missed
NetDay for anything."
Dennis Hong, project
manager, U.S. Department of Energy, and
technical volunteer for Mission High School in San Francisco,
California, on Mission's spring 1996 wiring efforts
|