Cable Installation Guide
Install the Cable Step 2:
Make the Schoolroom Connections

Tip from the Pros (Flush Mounting Jacks)

In drywall or plaster walls, position jacks 12 to 18 inches above the floor. If the schoolrooms have wide wooden baseboards, talk with your facilities administrator about installing jacks there. Plaster tends to crumble when you cut into it. Wood is more solid. Also, mounting screws don't always bite securely into the wood lath behind plaster. However, don't cut a box opening in the bottom two inches of a baseboard: The wall's bottom plate will block you from pushing your box in.

Don't place jacks where they will interfere with the trim around a door or window.